Developer-led · Sheffield
Chesterfield Road
Six flats on a steep, empty site, made buildable through technical design.
Completed| Location | Sheffield |
|---|---|
| Type | Developer-led |
| Before | Empty, steep site |
| After | 6 flats |
| Planning route | Technical design (RIBA Stage 4) |
| Homes | 6 |
| Floor area | 360 m² |
| Stage | RIBA 4 |
| Status | Completed |
Photos and drawings
The hard part
A very steep site, with bedrock close to the surface and difficult drainage.
What we did
A technically demanding scheme. We worked through the levels, foundations and drainage to deliver a design that might otherwise not have been buildable.
More projects
Related work.
Approved first timeCastleford
An empty car park turned into six back-to-back townhouses, approved first time in 12 weeks.
- Homes
- 6
- Floor area
- 300 m²
- Consent
- 12 weeks
Approved first timeBridge Court
A storage building near Forge Island turned into six commercial and light-industrial units.
- Units
- 6
- Consent
- 9 weeks
- Outcome
- First time
In progressWMC Rotherham
A split-level commercial building converted into eight flats through Class MA prior approval.
- Homes
- 8
- Floor area
- 350 m²
- Route
- Class MA