Free conversion unit estimator
How many flats could your building hold?
A first sense-check before a feasibility study. Set the floor area, floors and mix, and see a rough unit count based on the Nationally Described Space Standard.
Rough guide only. Daylight to every habitable room, means of escape, structure and the planning route all change the real number. A feasibility study tests it properly.
Send these numbers with an enquiryHow the estimate works.
We take the gross internal area of each floor and remove a share for stairs, lifts, corridors, bins and plant. That's the net-to-gross efficiency. What's left is divided by the average flat size for the mix you choose, rounded down to whole homes on each floor.
Flat sizes come from the Nationally Described Space Standard (NDSS), which every home converted under Class MA has to meet. The figures below are the minimum gross internal areas for single-storey flats.
| Home | Shorthand | Minimum area |
|---|---|---|
| 1 bed, 1 person | 1b1p | 39 m² (37 m² with a shower room) |
| 1 bed, 2 people | 1b2p | 50 m² |
| 2 bed, 3 people | 2b3p | 61 m² |
| 2 bed, 4 people | 2b4p | 70 m² |
| 3 bed, 4 people | 3b4p | 74 m² |
| 3 bed, 5 people | 3b5p | 86 m² |
| 3 bed, 6 people | 3b6p | 95 m² |
What changes the real number
Why a feasibility study comes next.
Daylight
Every habitable room needs adequate natural light. Deep plans and window positions often set the true limit.
Means of escape
Stair positions and travel distances can change where homes and corridors go.
Structure and services
Columns, risers and ceiling heights decide where walls, kitchens and bathrooms can sit.
Planning route
Class MA, full planning, extensions and conservation controls all affect what's allowed.
Market
The right mix depends on what sells or lets in that location, not only on what fits.
Ground floor
Bins, bikes, plant and entrances take space at street level that the estimate doesn't model.