Conversion architects in Sheffield and South Yorkshire

Empty commercial buildings, turned into homes that work.

Offices, shops, above-shop space, pubs, mills and warehouses. We find out early how many homes a building can hold and which planning route fits, then take the scheme through planning, technical design and onto site.

Answers early, before you commit.

The questions that decide a conversion are simple to ask and easy to get wrong: how many homes, by which route, and what could stop it.

We start with the building: its floor plates, windows, structure, cores and neighbours. We test layouts against the space standards and daylight before anything else, so you know whether the numbers work before you buy or spend on reports.

From there we run the scheme from prior approval or planning through to Building Regulations and construction. The same directors stay with it all the way.

Buildings we convert

Every building type has its own planning route and pinch points.

Offices

+Usually Class MA prior approval

Office buildings are the most common conversion. Floor-to-ceiling heights are often generous and cores can be reused, but deep floor plates and fixed window grids decide how many good homes you can fit.

What to watch

  • Deep plans that leave inner rooms without daylight
  • Window spacing that doesn't line up with new room layouts
  • Lift and stair cores, and whether they meet current fire guidance
  • Plant, bins and cycle storage at ground level
  • Noise from neighbouring commercial uses

What we do

  • Test layouts against NDSS and natural light before you buy
  • Check the building has two years of continuous Class E use and look for Article 4 directions
  • Prepare the prior approval application and coordinate the supporting reports
  • Carry the design through Building Regulations and on to site

Retail units

+Usually Class MA prior approval

Shops can convert well, particularly on secondary high streets. The street frontage is the tricky part: it needs to read as a home without deadening the street.

What to watch

  • Shopfront redesign for privacy and a residential frontage
  • Rear access, refuse and cycle storage
  • In conservation areas, the effect of losing ground-floor retail
  • Single-aspect units with limited daylight

What we do

  • Design a frontage that fits the street
  • Confirm whether prior approval or full planning gives the better outcome
  • Coordinate fire separation and acoustic detail with neighbouring units

Above-shop space

+Class MA or full planning

Empty upper floors over shops are an under-used source of homes. They often need their own street entrance, and careful separation from the shop below.

What to watch

  • Separate access from the street
  • Fire separation from the shop below
  • Sound insulation between uses
  • Keeping the shop trading during the works

What we do

  • Find a layout that keeps the ground floor lettable
  • Work out the most efficient planning route
  • Detail separation so Building Regulations are met

Pubs

+Full planning

Pubs are outside Class E, so they need full planning permission. Many councils protect them, so the case for change has to be made early and with evidence.

What to watch

  • Local plan policies that protect pubs; marketing evidence may be needed
  • Assets of Community Value listings
  • Heritage features and character
  • Car parks and outbuildings that could support new homes

What we do

  • Build the planning case early, with evidence
  • Combine conversion with new-build where the site allows
  • Respect the building's character in the design

Mills & warehouses

+Full planning

Mills and warehouses give generous volumes and strong character. They also bring very deep plans, heritage controls and, often, riverside flood risk.

What to watch

  • Very deep floor plates that need atria or lightwells
  • Listed status or conservation area controls
  • Structure, floor loading and fire strategy for taller buildings
  • Flood risk for riverside sites

What we do

  • Design layouts that bring daylight into deep plans
  • Work with heritage, structural and fire consultants
  • Phase larger schemes so they stay viable

Class MA explained

Prior approval: faster than planning, but not automatic.

Class MA is a permitted development right that lets buildings in Commercial, Business and Service use (Class E) become homes without a full planning application. Instead, the council checks a defined list of matters through a prior approval application, and normally has eight weeks to decide.

The building needs to have been in Class E use for a continuous two years before you apply. Listed buildings and some protected locations are excluded, and councils can remove the right in particular areas with an Article 4 direction. Once approved, the change of use has to be completed within three years.

Where we come in

Most refusals come down to a few things: rooms without enough daylight, homes below the space standards, or reports that don't answer the council's questions. We design to pass those tests from the first layout, and we tell you plainly when full planning would get a better result.

Test your building's unit count
01

Transport

The effect on the local road network and highway safety.

02

Contamination

Whether the site carries contamination risks for new residents.

03

Flooding

Flood risk to the building and the people who will live in it.

04

Noise

Noise from nearby commercial premises affecting the new homes.

05

Natural light

Adequate natural light in every habitable room. This test shapes most layouts.

06

Neighbouring uses

Whether introducing homes would harm nearby industry, storage or waste uses.

07

Conservation areas

Where a ground floor changes use, the impact on the character of the area.

08

Fire safety

For buildings 18m or more, or seven storeys and up, the fire safety arrangements.

09

Space standards

Every new home must meet the Nationally Described Space Standard.

General guidance only. The right route depends on the building's lawful use, location, any Article 4 directions and listing status, which we check at feasibility.

Questions we're often asked

Should I go for Class MA or full planning?

Class MA is usually quicker and more certain if the building qualifies and a good layout passes the tests. Full planning can be better when you want to extend, change the outside significantly, or the building doesn't qualify. We compare both at feasibility.

Can you tell me how many flats fit before I buy?

Yes. A feasibility study tests layouts against the space standards and daylight using the floor plans or a measured survey. Our unit estimator gives a quick first sense-check.

Do Building Regulations still apply under prior approval?

Yes. Prior approval covers planning only. The homes still need Building Regulations approval for fire safety, sound insulation, energy and the rest, which we handle through technical design.

How big are the schemes you take on?

Most conversions we see are 5 to 10 homes, and we take on larger buildings too.

Got a building in mind? Let's look at it together.