Developer-led · Rotherham town centre
Bridge Court
A storage building near Forge Island turned into six commercial and light-industrial units.
Approved first time| Location | Rotherham town centre |
|---|---|
| Type | Developer-led |
| Before | Storage building (Class B8) |
| After | 6 units (Class E and B2) |
| Planning route | Full planning |
| Units | 6 |
| Consent | 9 weeks |
| Outcome | First time |
| Status | Approved first time |
Photos and drawings
The hard part
Making the layout work: getting the most usable, lettable units out of the existing building.
What we did
We set out a clear strategy early, which made the layout and the planning case straightforward. Consent came in nine weeks, first time.
More projects
Related work.
Approved first timeCastleford
An empty car park turned into six back-to-back townhouses, approved first time in 12 weeks.
- Homes
- 6
- Floor area
- 300 m²
- Consent
- 12 weeks
CompletedChesterfield Road
Six flats on a steep, empty site, made buildable through technical design.
- Homes
- 6
- Floor area
- 360 m²
- Stage
- RIBA 4
In progressWMC Rotherham
A split-level commercial building converted into eight flats through Class MA prior approval.
- Homes
- 8
- Floor area
- 350 m²
- Route
- Class MA